11ER FOOD GMBH, FRASTANZ

Info

Projects
Adaptation ventilation
construction time
1st construction phase 2017 - 2nd construction phase 2018
Description
The company 11er Nahrungsmittel GmbH renewed all ventilation systems in production. At the same time, 1 MW of heating energy was decoupled from the chillers as an energy-saving measure.
Technical data
16 ventilation systems Total air volume: 400.000 m³/h Central heat supply ventilation: 3 MW heat recovery Cooling machine: 1 MW Concrete core activation: 2.500 m² Heated/chilled ceiling: 200 m²
Features
The work in production, such as the sewer system, could only be carried out during the 3 weeks of company vacation. So it was a challenge to coordinate all trades.