Netzer Group – pure joy for customers

In the field of clean room technology, we act as a general contractor and deliver turnkey clean room technology systems. We also handle complex issues and implementations from a single source - from finding a solution to implementation to support and optimization during ongoing operations.

KUNZ GMBH, HARD
Project: workshop 5
Construction time: 2017
Description:
Internationally active family company for the production of cranes for different applications. The new hall is used for switch cabinet construction. The hall is heated and cooled via component activation. A brine/water heat pump with geothermal probe system serves as a heat or cold generator.
FLATZ GMBH, LAUTERACH
Project: Shipping and high-bay warehouse
Construction time: 2016-2017
Description:
Due to the ongoing success of the company, Flatz needs an improvement in its own infrastructure. With the new construction of the logistics center with a fully automated high-bay warehouse 4, the company is setting new standards in flexibility, speed and delivery service.
LAND-LEBEN FOOD GMBH, ANTHERING
Project: New production
Construction time: 2015 – 2016
Description:
Traditional company for the production of soups and salads from Salzburg. Frying and drying processes with thermal oil. Heat supply almost exclusively via waste heat from the production processes. The adsorption chiller is operated with waste heat, the chiller with dry cooler and free cooling function.
VAT VACUUM VALVES AG, HAAG
Project: Clean room ISO 6 / Plant II
Construction time: 2017
Description:
The clean room with class ISO 6 material and personnel lock, material hatch was integrated into Plant II as a turnkey solution. Compact design, location of the technology on the clean room ceiling, 100% integration of all necessary media in the inventory
STARK SPANSYSTEME GMBH, RANKWEIL
Project: New Build
Construction time: 2016-2017
Description:
STARK Spannsysteme GmbH develops and produces zero-point clamping systems, which are mainly used in mechanical production (CNC machines), handling and assembly technology. The new building includes a production area of ​​approx. 2000 m² and an administration area of ​​approx. 600 m².
11ER FOOD GMBH, FRASTANZ
Project: Adaptation ventilation
Construction time: 1st construction phase 2017 – 2nd construction phase 2018
Description:
The company 11er Nahrungsmittel GmbH renewed all ventilation systems in production. At the same time, 1 MW of heating energy was decoupled from the chillers as an energy-saving measure.
IVOCLAR VIVADENT MANUFACTURING GMBH, BÜRS
Project: FIT 2020 "Competence Center Equipment"
Construction time: 2017 – 2018
Description:
Ivoclar Vivadent Manufacturing GmbH in Bürs is a subsidiary of Ivoclar Vivadent AG in Schaan/FL and specializes in the manufacture of dental technology devices, which are used both in the dental practice and by the dental technician in the dental laboratory.
THOMAS PRINZ GMBH, HÖRBRANZ
Project: Conversion of the office wing
Construction time: 2017 – 2018
Description:
The fine distillery Prinz in Hörbranz is renovating its entire company headquarters in Ziegelbachstraße, with the first construction phase consisting of the construction of an office wing. The office wing is conditioned by a surface discharge system and a mechanical ventilation system.

Success
Stories

Our customers -