SEALTECH AG, RUGGELL

Info

Project
Clean room ISO 5 / ISO 8
Construction time
2017-2018
Description
The clean room with class ISO 5 / ISO 8 was integrated into the existing building. Planning, preparation of a specification sheet, tendering and implementation as general contractor with all-inclusive prices.
Technical data
Total air volume: 5,000 m³/h Heat pump switchable: 17 kW heating, 20 kW cooling Humidification and dehumidification, pressurization
Special features
The heating and cooling supply was implemented using integrated heat pump technology and control technology.