SEALTECH AG, RUGGELL

Info

Projects
Clean room ISO 5 / ISO 8
construction time
2017-2018
Description
The clean room with class ISO 5 / ISO 8 was integrated into the existing building. Planning, creating a requirement and functional specification, making an offer and implementation as a general contractor with flat-rate prices.
Technical data
Total air volume: 5.000 m³/h Heat pump switchable: 17 kW heating, 20 kW cooling humidification and dehumidification, pressure maintenance
Features
The heat and cold supply was implemented using integrated heat pump technology and control technology.