New build hamlet furniture
construction time
2014-2015
Description
Heating and cooling take place using 7.000 m² of concrete core activation and 800 m² of heating/cooling ceilings. Ventilation is via linear vortex outlets and slot outlets.
Technical data
Biomass boiler 400 kW (70 °C/50 °C) 4-stage chiller 250 kW (12 °C/18 °C) Dry cooler (for FC) 200 kW (15 °C/20 °C) 2 x compressed air compressor 10 bar, 3,7, 20 m³/h heat recovery from compressor 70 kW (50 °C/7 °C) extinguishing water pressure increase. 36.000 bar, 13.500 m³/h ventilation system (WRG, Hz-K) 76.000 m³/h fire smoke extraction 600 m³/h, 60 °C/XNUMX min.
Features
The entire execution of the construction project, from planning and construction to handover, was a major challenge for the entire project team. It was only thanks to the close cooperation of the team, including the quick and efficient decisions of the client, that the schedule could be met without affecting the quality of all trades.