FLATZ GMBH, LAUTERACH

Info

Projects
Shipping and high-bay warehouse
construction time
2016-2017
Description
Due to the ongoing success of the company, Flatz needs an improvement in its own infrastructure. With the new construction of the logistics center with a fully automated high-bay warehouse 4, the company is setting new standards in flexibility, speed and delivery service.
Technical data
HRL: Building height 34,9 m / 16.200 and 5 RBG's HRL ventilation device 8.00 m³/h Dispatch building: 14 loading ramps Ventilation device with 12.700 m³/h and a heat output of 170 kW Compressor WRG 42 kW Radiant ceiling panels 145 kW Air curtain system 240 kW
Features
A sprinkler system with 16.000 sprinklers is installed throughout the new building. Smoke extraction system in the shipping building with 40.000 m³/h The piping and positioning of the individual sprinklers in the pallet storage areas in the high-bay warehouse were a particular challenge.