KUNZ GMBH, HARD

Info

Projects
workshop 5
construction time
2017
Description
Internationally active family company for the production of cranes for different applications. The new hall is used for switch cabinet construction. The hall is heated and cooled via component activation. A brine/water heat pump with geothermal probe system serves as a heat or cold generator.
Technical data
Geothermal probe system with 8 probes of 160 m each Heat pump: 57 kW Component activation: 1100 m² Free cooling heat exchanger: 70 kW
Features
The heating/cooling center was designed as a mobile technology module in order to be optimally prepared for future developments. Degassing of the burning swamp gas diffusing into the geothermal probe system.