THOMAS PRINZ GMBH, HÖRBRANZ

Info

Projects
Conversion of the office wing
construction time
2017 - 2018
Description
The fine distillery Prinz in Hörbranz is renovating its entire company headquarters in Ziegelbachstraße, with the first construction phase consisting of the construction of an office wing. The office wing is conditioned by a surface discharge system and a mechanical ventilation system.
Technical data
Underfloor cooling or heating: 300 m² ventilation: 3.000 m³/h heating supply = existing cooling supply = existing
Features
Since this is an attic conversion in an old building, the installation of the ventilation components was more difficult compared to a new building. Image source: © FRÜHARCHITEKTURBÜRO ZT GMBH | www.frueharchitektur.com