
Info
Project
Engineering activity / client representation in the field of TGA
Construction time
(Planning+implementation) August 2020 to May 2024
Description
Otto Wohlgenannt GmbH from Dornbirn has invested heavily in a new five-storey extension. This includes a large small parts warehouse, a new repair and assembly area, test stand, washing hall and an administration wing with canteen and function room. The globally active engineering company NETZER GROUP from the Vorarlberg region was commissioned to provide engineering services and represent the client in the field of networked building technology and measurement and control technology.
Technical data
Administration 5,500m², production area 1,980m², test bench & car wash 280m², high-bay warehouse 2,260m²
Special features
The energy pile system at Fahrzeugbau Wohlgenannt. It serves as a deep foundation and also uses the earth's energy for heating and cooling. For this purpose, the 400 static pilots were covered with pipes and formed into a kind of geothermal heat exchanger. In summer, the energy from the ground at a depth of 15 to 30 meters is used for cooling and in winter to operate a heat pump. 90 percent of the piles were activated in this way.