Info
Project
Conversion of office wing
Construction time
2017 - 2018
Description
Fein-Brennerei Prinz in Hörbranz is renovating its entire company headquarters in Ziegelbachstrasse, with the first construction phase consisting of the construction of an office wing. The office wing is conditioned via an area discharge system and a mechanical ventilation system.
Technical data
Floor cooling and heating: 300 m²
Ventilation: 3,000 m³/h
Heating supply = existing building
Cooling supply = existing building
Special features
As this was a loft conversion in an old building, the installation of the ventilation components was more difficult than in a new building.
Image source: © FRÜHARCHITEKTURBÜRO ZT GMBH | www.frueharchitektur.com