With this project at the Pürgen site, the NETZER GROUP once again demonstrates its expertise as a general contractor for APM Technica AG. Despite the complex conditions in the existing building, the cleanroom was completed in compliance with ISO 7 standards, energy-efficiently, and on schedule.

This achievement enables increased production capacity, the ability to expand the workforce, and the ability to handle larger orders, and demonstrates the NETZER GROUP’s strength in planning, implementation, and operational efficiency for demanding cleanroom projects.

Facts_APM

Factbox

Responsibility:
general contractor
Implementation time:
(Planning + implementation) 8 months
room area:

1 cleanroom measuring 151 m², constructed as a hall-in-hall
structure within an
existing warehouse. Personnel and
material airlocks were integrated. The
system provides a 30-fold air change rate,
precise temperature and humidity control
as well as a coordinated pressure cascade from the
cleanroom through the airlocks into the
surrounding environment, thereby ensuring stable
ISO-7 conditions for an efficient and
reliable production environment.

Trades:

Steel Construction
Housing
Heating
Refrigeration
Ventilation
Compressed Air
Electrical Engineering
Measurement and Control Technology
Software & Control Engineering
Insulation Technology
Plumbing
Certification
Furnishing