WEIDMANN MEDICAL TECHNOLOGY AG, SALTILLO/MEXICO

Info

Project
Production - Diagnostic products
Construction time
12 months (order to turnkey handover)
Description
Weidmann Medical Technology AG needed an ISO8 cleanroom with an area of 800 m² for the production of diagnostic products at its Mexican site in Saltillo. The realization of this project was challenging, as the time frame was tight and the tasks as general contractor were extensive.
Technical data
Area: 800m², trades: foundations, floor coating, machine connections, crane systems, steel construction, electrical engineering, refrigeration technology, vacuum technology, air conditioning, automation, housing, monitoring, technical centers as a ready-to-use shipping container solution
Special features
The tight schedule of just one year posed a particular challenge. Normally, the NETZER GROUP plans the technical centers of the cleanrooms in turnkey modules that are commissioned and tested in advance. However, due to the limited space available in the production hall and the time factor, the technical control centers were housed in shipping containers. The modules were pre-assembled and implemented in the containers ready for operation and then integrated directly in Mexico.
Facts_Weidmann-Medical_Mexico