Integration of a modern ISO8 cleanroom + complete infrastructure into an existing building from 1945
Construction time
Construction time approx. 1 year (2021 - 2022)
Description
Integration of a new ISO8 cleanroom into a historic building dating back to 1945. The use of Building Information Modeling (BIM) optimized the construction process and guaranteed cost-efficient and on-time completion. The result: an efficient, safe and sustainable cleanroom that was immediately ready for use.
Technical data
Area: 1,100 m², trades: steel construction, housing, heating, cooling, ventilation, compressed air, electrical engineering, I&C, floor laying work, plumber, indoor crane, material handling, sanitary, machine vacuum
Special features
When integrating new cleanrooms into old buildings, unforeseeable problems can arise that affect deadlines and costs. The complex task required a great deal of flexibility and extensive know-how. All trades were integrated and qualified to match the infrastructure of the old building.