New Weiler furniture building
Construction time
2014-2015
Description
Heating and cooling are provided by 7,000 m² of concrete core activation
and 800 m² heating/cooling ceiling.
Ventilation is provided via linear vortex diffusers and slot diffusers.
Technical data
Biomass boiler 400 kW (70 °C/50 °C)
4-stage chiller 250 kW (12 °C/18 °C)
Recooler (for FC) 200 kW (15 °C/20 °C)
2 x air compressor 10 bar, 3.7 m³/h
Heat recovery from compressor 20 kW (70 °C/50 °C)
Extinguishing water pressure boost 7 bar, 36,000 m³/h
Ventilation system (heat recovery, Hz-K) 13,500 m³/h
Smoke extraction 76,000 m³/h, 600 °C/60 min.
Special features
The entire execution of the construction project, from planning and construction to handover, was a major challenge for the entire project team.
It was only thanks to the team's close cooperation, including the client's quick and efficient decisions, that the schedule could be met without compromising the quality of any of the trades.