KÜNZ GMBH, HARD

Info

Project
Workshop 5
Construction time
2017
Description
Internationally active family company for the manufacture of cranes for various applications. The new hall will be used for switch cabinet construction. The hall is heated and cooled via component activation. A brine/water heat pump with a geothermal probe system serves as the heat and cooling generator.
Technical data
Geothermal probe system with 8 probes of 160 m each Heat pump: 57 kW Building component activation: 1100 m² Free cooling heat exchanger: 70 kW
Special features
The heating/cooling center was designed as a mobile technology module in order to be optimally prepared for future development. Degassing of the burning sump gas diffusing into the geothermal probe system.