STARK SPANNSYSTEME GMBH, RANKWEIL

Info

Project
New building
Construction time
2016-2017
Description
STARK Spannsysteme GmbH develops and produces zero-point clamping systems, which are mainly used in the field of mechanical production (CNC machines), handling and assembly technology. The new building comprises a production area of approx. 2000 m² and an administration area of approx. 600 m².
Technical data
Cooling capacity: 250 kW Heating capacity: 140 kW Two air compressors with 30 kW each Building component activation: 2000 m² Metal heating. Cooling ceiling: 600 m² Office ventilation system: 5000 m³/h Production ventilation: 30,000 m³/h
Special features
Free cooling via a groundwater well with 250 kW output. Resource-saving heating using a groundwater heat pump. Highly efficient hall cooling through component activation and layered ventilation principle. Draught-free air supply in the production hall.